30-Day Copper Disconnect Notice? We'll Keep Your Critical Lines Online.
Traditional copper POTS (Plain Old Telephone Service) lines are being decommissioned. For many buildings, those lines power fire alarm panels, elevator emergency phones, security gates, fax lines, ATMs, and POS terminals.
When copper goes dark, these devices can't dial out, creating safety, compliance, and operational risks.
Good news: You don't have to rewire the building. A POTS replacement simulates the analog line your devices expect, while connecting over LTE, Ethernet, or fiber behind the scenes.
Drop-in analog line simulation for legacy devices (life-safety and specialty)
Flexible backhaul: LTE, Ethernet, or fiber—whichever fits your site
Battery backup options to maintain dial tone during outages
Remote monitoring for health checks and troubleshooting
Rapid deployment across single sites or multi-property portfolios
Partner-ready: white-label enablement for MSPs, VoIP, and telecom resellers
Keep your existing equipment, wiring, and workflows—just replace the dying copper
...And More!
Typical turnaround: Days, not weeks.
We identify every line tied to copper (we'll help you audit)
Choose backhaul (LTE/Ethernet/fiber) and battery needs
Drop-in hardware connects to your existing device—no rewire
Live call tests, documentation, and remote monitoring
Commercial-grade hardware sized to your line count and use cases, with optional UPS for continuous dial tone.
Certified installers or guided self-install, remote monitoring, and responsive support that speaks to both life-safety and IT.
White-label branding, collateral, spec sheets, proposal templates, and a partner portal—add POTS replacement to your stack and open a new revenue stream.
From hospitals and schools to hotels and high-rises, we protect systems that have to work every time.
Resources & Insights
Audits, checklists and cost guides used by property managers and MSPs.
The six-step audit method we run on portfolios of 1 to 500 buildings. Most owners undercount by 30–50%.
Read guideSide-by-side on cost, uptime and compliance — and why most buildings end up with a hybrid.
Read guideHow to run a 10-to-1,000 site rollout on schedule, on budget and without breaking compliance.
Read guideDon't wait for the copper disconnect date. Start your transition now.
Start Now